DECHY logo

Ctrl K or / to search, arrows to move, Enter to open

Case study

ForgePlan

A manufacturing operations system that keeps every line on schedule

A precision components manufacturer with four production lines

Timeline
12 weeks
ForgePlan manufacturing operations dashboard with production schedule, machine status, inventory, and quality control

The story

From the problem to a system that works

  1. 01

    What the client wanted

    See production, machines, inventory, and quality in one place, and plan work orders without a whiteboard and three spreadsheets.

  2. 02

    The challenge

    Planners scheduled lines on a whiteboard, machine status lived with the operators, and stock-outs stopped lines without warning. Nobody could say on Monday what would ship on Friday.

  3. 03

    What we built

    We built ForgePlan, an operations platform with a drag-and-drop production schedule, live machine status, inventory with reorder alerts, quality control tracking, and work orders linked to every line.

Delivered

What ForgePlan includes

  • Production schedule by line and week
  • Live machine status and uptime
  • Inventory with low-stock alerts
  • Quality control and pass-rate tracking
  • Work order management

Built with

Timeline: 12 weeks from kickoff to launch.

Want results like ForgePlan?

Tell us what you need. We reply with a plan, a fixed quote, and a timeline.